SpecsIntact

Since 2013 I have been working with a specification authoring system known as SpecsIntact. This system uses HTML mark up.

When editing the required submittals, they fall into the following categories:

SpecsIntact Submittal categories
01 Preconstruction Submittals
02 Shop Drawings
03 Product Data
04 Samples
05 Design Data
06 Test Reports
07 Certificates
08 Manufacturer Instructions
09 Manufacturer Field Reports
10 Operations & Maintenance
11 Close Out