Monday, May 19, 2008

Gates



I detailed this gate. The project was "Harbor Lofts" for the CIM Group. It is located in Anaheim, California. Sales began in 2008.
Post a Comment

Recent Architectural Projects

  • 2013-2017 NASA Fuel Farm ~$4m
  • 2016-2017 Yuma Range Towers
  • 2015-2017 SBIAA Hangar 763 improvements ~ $3.5m
  • 2016-2017 Beale AFB Building B1210/B1214 2nd floor ~2.2m
  • 2015-2016 VBA Wilshire 2nd floor, GSA ~$4m